Installation Instructions,566768" Post to Beam Flush (P2B-LS-8F)Installation Instructions, 56676updated periodically and should not be relied upo
kit includes 2 assemblies 318.2612.53 1275.00 19.96.79 56676updated periodically and should not be relied upon after May 1, 2015. Please visit www.O
Suggested Tools(others may be required)V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10,
postalign notches with top of (Hex Cap Nut) provided3/8" DriverTool Required(OWT Screw) providedstep 1V1.00 - Installation Instructions effective
step 2 Timber ScrewsV1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This informa
see Installation Instructions, OWT Timber Bolts BEFORE proceedingOWT Timber Boltsold separately(HCN)3/8" DriverTool Required(Timber Bolt)step 2 T
Kommentare zu diesen Handbüchern